Testing Induction Loop Kits

Test equipment hire

Introduction

A site must be tested for electromagnetic interference. Hire service available.

If you are in any doubt of the construction of the building it is advisable to use our portable induction loop test equipment and test it first. This saves having to deal with problems after the loop has been installed.

 

Electromagnet background noise test meter

Portable induction loop test equipment

What's in the kit?

Electromagnetic noise field strength meter

This test is mandatory. Using our field strength meter (FSM) will determine if the site has electromagnetic noise. An induction loop system must not be installed if the measured noise is above -20dB as it would cause interference (a continuous hum) to the hearing aid user and would not comply with BS6083 Part 4. Full user instructions provided.

 

Portable induction loop and field strength meter test equipment

Because metalwork, particularly aluminium, can have an unpredictable effect on an induction loop systems sound output level and performance it is advisable to run a temporary loop around the venue and test it first. This saves having to deal with problems after the loop has been installed. The test equipment is a complete portable induction loop system with a dual function field strength meter. The loop system can be set up in the area to be tested and the dual function FSM can be used to measure electro-magnetic background noise and loop output level. Full user instructions provided.


Please use our Selector below to help you choose the correct induction loop test equipment.

Field Strength Meter
For more details > click here

Portable induction loop test equipment
For more details > click here

TOP